A Ellery company - serving Los Angeles, CA
Ellery ADU Studio Los Angeles adu team

ADU Design & Permitting in Santa Monica - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates

ADU in Santa Monica, CA

Junior ADU and interior conversion in Santa Monica typically runs $85,000-$165,000 all-in, drawings through final inspection, while site prep and utility work adds $18,000-$55,000 depending on coastal-zone conditions and existing infrastructure age. Most Santa Monica ADU projects require a Coastal Development Permit layered on top of standard building permits, a dual-approval process that adds timeline and cost compared to inland cities. Call (424) 551-7706 to schedule your free estimate, or read on for specific pricing by job type.

Call (424) 551-7706

We opened Ellery ADU Studio in 2015, the year California’s ADU laws began shifting, and we’ve since designed, permitted, and built over 900 ADUs across Los Angeles County. Our dispatch and scheduling are coordinated from our Los Angeles office, with crews serving Santa Monica locally. Every project is governed by The Haven Standard: a written price before work starts, a documented photo record on every visit, and a 365-Day Done Right Promise backed in writing.

Why Santa Monica Homes Are Different

Nearly all of Santa Monica’s residential parcels fall within the California Coastal Zone, meaning most ADU projects require a Coastal Development Permit from the city’s Planning & Community Development division on top of standard building permits. This dual-approval layer simply doesn’t exist for contractors working in adjacent Culver City, West Hollywood, or unincorporated LA County. The Rent Control Charter Amendment, enacted in 1979 and among California’s strictest, creates genuine legal ambiguity for homeowners adding ADUs to multi-family lots, making regulatory navigation as critical as the construction itself.

The housing stock compounds the challenge. Ocean Park and Sunset Park are dense with 1920s-1940s Craftsman bungalows and Spanish Colonial Revival homes on narrow lots, while the 1950s-60s “dingbat” stucco apartment buildings built over street-level carports require full structural upgrades before Building & Safety will approve conversion permits. Pre-1940 detached garages in Ocean Park and North of Montana routinely trigger engineered foundation reports, with rubble-stone and unreinforced concrete perimeter foundations adding soils reports and retrofits before framing begins.

The marine layer drives higher year-round humidity inside unconditioned structures than even five miles inland, making vapor barriers, mold-resistant sheathing, and ERV ventilation non-negotiable. Salt-laden coastal air accelerates corrosion on exposed metal connectors, flashing, and mini-split condenser units, shortening service intervals compared to inland builds.

Our Main Santa Monica Services

Homeowners in Santa Monica call us most often for these three services, each with its own dedicated page and pricing:

ADU Design & Permitting in Santa Monica

We treat the permit set as the core product, not an afterthought. In Santa Monica, this means navigating the Coastal Development Permit process alongside standard building permits, with drawings that anticipate both Planning & Community Development and Building & Safety review cycles. Our permit sets include structural calculations, Title 24 energy compliance, and coastal-zone-specific drainage plans. ADU Design & Permitting in Santa Monica covers the full process from feasibility study to issued permit.

ADU Design & Permitting in Santa Monica

Garage Conversion ADU in Santa Monica

Garage conversions in Santa Monica face the marine-layer humidity problem head-on: existing slab moisture, corroded connectors, and minimal stem-wall foundations on dingbat carports require pre-construction remediation that out-of-area contractors frequently miss in their initial quotes. We assess foundation adequacy, vapor intrusion, and electrical service capacity before quoting. Garage Conversion ADU in Santa Monica details our full process.

Garage Conversion ADU in Santa Monica

New Detached ADU in Santa Monica

New detached units in Santa Monica trigger the full coastal-zone review, including potential California Coastal Commission oversight for lots near the shoreline. Setback calculations, height restrictions, and view-impact assessments differ from standard Los Angeles County rules. We coordinate geotechnical reports and coastal engineering as needed within our single-contract model. New Detached ADU in Santa Monica explains feasibility and pricing.

New Detached ADU in Santa Monica
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (424) 551-7706

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Junior ADU & Interior Conversion in Santa Monica

Contractors building interior wall framing during a garage conversion ADU project
Junior ADU & Interior Conversion in Santa Monica

Junior ADU and interior conversion in Santa Monica solves a specific problem: homeowners who want rental income or family housing without building new square footage, but whose existing structures - 1920s Craftsman basements, 1960s dingbat storage rooms, or attached wings with outdated systems - need complete reconfiguration to meet code. The coastal climate means every interior conversion must address moisture management, ventilation, and corrosion-resistant materials from the first design meeting. Junior ADU & Interior Conversion covers our full service range beyond Santa Monica.

Basement ADU

Signs you need it

Your basement has standing water after winter storms, no egress window, or a 6-foot-8 ceiling that fails Santa Monica’s habitability standards.

What it costs in Santa Monica

Basement ADU conversions in Santa Monica typically run $95,000-$175,000 all-in, including excavation for headroom, engineered waterproofing, and ERV installation.

How we do it

We start with a geotechnical moisture assessment, design the egress and ventilation system to coastal-zone specs, build the permit set, and construct with mold-resistant framing and closed-cell insulation.

Room-to-ADU Conversion

Signs you need it

You have an attached bedroom wing, sunroom, or former servant’s quarters with separate exterior access but shared utilities and no kitchen.

What it costs in Santa Monica

Room-to-ADU conversions in Santa Monica typically run $75,000-$140,000 all-in, including separate electrical meter, mini-split HVAC, and kitchen build-out.

How we do it

We verify structural capacity for the added load, design utility separations to code, prepare the full permit set with Title 24 compliance, and build with sound-attenuated party walls per Santa Monica’s multi-family proximity rules.

What Junior ADU & Interior Conversion Costs in Santa Monica

Item Typical range in Santa Monica
Basement ADU conversion $95,000 - $175,000
Room-to-ADU conversion $75,000 - $140,000
Above-garage ADU (interior structure) $85,000 - $155,000

Can a basement ADU in Santa Monica meet coastal-zone ventilation requirements?

Yes, with an Energy Recovery Ventilator sized to ASHRAE 62.2 standards and humidity-controlled intake placement above the marine layer’s worst accumulation zone. We engineer this into every basement permit set; call (424) 551-7706 for a written quote.

Will converting an interior room trigger rent control review?

Single-family homes are generally exempt, but multi-family lots require careful analysis under Santa Monica’s 1979 Rent Control Charter Amendment. We coordinate with land-use counsel when needed, documented in your permit set before construction starts.

ADU Site Prep & Utilities in Santa Monica

Architectural professional and client reviewing ADU design plans and permitting documents.
ADU Site Prep & Utilities in Santa Monica

ADU site prep and utilities in Santa Monica means working with 1920s-1960s infrastructure on narrow coastal lots where the original electrical, plumbing, and gas systems were never designed for additional dwelling units. The salt air and marine humidity corrode what’s underground as aggressively as what’s exposed, and Santa Monica Building & Safety will not issue an ADU certificate of occupancy until every utility meets current code. ADU Site Prep & Utilities details our full capabilities.

Foundation & Grading

Signs you need it

Your garage or carport slab is cracked, under 4 inches thick, or built on fill without engineered compaction.

What it costs in Santa Monica

Foundation replacement and grading for ADU site prep in Santa Monica typically runs $22,000-$48,000, including soils report and engineered stem-wall design.

How we do it

We order the geotechnical report, design the engineered foundation to current CBC standards, and build with corrosion-resistant rebar and vapor barrier integration.

Electrical Panel Upgrade

Signs you need it

Your main panel is under 200 amps, has fused disconnects, or shows scorch marks from salt-air corrosion at the bus bars.

What it costs in Santa Monica

Electrical panel upgrades for ADU service in Santa Monica typically run $8,500-$18,000, including SCE coordination and separate meter socket where required.

How we do it

We calculate ADU load with EV-ready capacity, coordinate Southern California Edison for service sizing, and install with marine-rated enclosure and ground-fault protection.

What ADU Site Prep & Utilities Costs in Santa Monica

Item Typical range in Santa Monica
Foundation & grading $22,000 - $48,000
Electrical panel upgrade $8,500 - $18,000
Plumbing lateral extension $12,000 - $28,000

Does Santa Monica require separate utility meters for ADUs?

Not for Junior ADUs, but detached ADUs and most garage conversions require separate electric meters; we coordinate with SCE early in permit set development to avoid delays. Call (424) 551-7706 to confirm your property’s requirements.

How long does foundation work add to the overall timeline?

Engineered foundations in Santa Monica’s coastal zone typically add 4-6 weeks for soils reporting and Building & Safety review, but we run this parallel to permit drafting to protect your overall schedule.

Get the price in writing before anything starts.Serving Santa Monica - a real person answers, day or night.
Call now

Brands We Service in Santa Monica

We specify and coordinate prefab and modular systems from Abodu, Cover, and Dvele within our single-contract design-build model, with local parts availability and marine-environment specification adjustments. Typical prefab coordination turnaround from deposit to site-ready is 14-18 weeks. See our brands for the full list.

Pricing for ADU in Santa Monica, CA

Architect designing an accessory dwelling unit with building codes and blueprints
Pricing for ADU in Santa Monica, CA
Service Typical range in Santa Monica
Junior ADU & Interior Conversion - Basement ADU $95,000 - $175,000
Junior ADU & Interior Conversion - Room-to-ADU $75,000 - $140,000
Junior ADU & Interior Conversion - Above-Garage ADU $85,000 - $155,000
ADU Site Prep - Foundation & Grading $22,000 - $48,000
ADU Site Prep - Electrical Panel Upgrade $8,500 - $18,000
ADU Site Prep - Plumbing Lateral Extension $12,000 - $28,000
ADU Site Prep - Gas Line Extension $6,500 - $14,000
ADU Site Prep - Landscaping & Hardscape $8,000 - $22,000

Prices push higher in Santa Monica when coastal-zone permits require additional review cycles, pre-1940 foundations need engineered retrofit, or marine-layer moisture remediation adds vapor-barrier and ERV scope. Under Haven Standard Clause 1, every project is quoted with a written price before any work begins; the scope is locked at signing with no door-side upsells.

Neighborhoods We Serve in Santa Monica

Our crews work across Santa Monica’s varied residential fabric, from the narrow Craftsman lots of Ocean Park to the estate parcels North of Montana. Dispatch is coordinated from our Los Angeles office with same-week scheduling availability for estimates.

  • Ocean Park
  • Sunset Park
  • North of Montana
  • Pico District
  • Wilshire/Montana

Service Area - Cities Near Santa Monica

Professional designer presenting an ADU and home property site plan
Service Area - Cities Near Santa Monica

We serve homeowners throughout the Westside and mid-city corridor. Our crews are regularly in Venice, CA for coastal-zone ADU work, Culver City, CA where standard L.A. County rules apply without the CDP layer, Beverly Hills, CA for hillside grading and utility challenges, and West Hollywood, CA for compact-lot interior conversions.

Serving Santa Monica, CA - Our Local Coverage Area

We’re based in the Santa Monica area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU in Santa Monica

Technician installing HVAC system for a garage conversion ADU
FAQs About ADU in Santa Monica

Ready to get started? Free estimates · Free in-home estimates response in Santa Monica
Call (424) 551-7706

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Santa Monica Customers Say

★★★★★ 4.8 from 6+ reviews

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

- Odette N.

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

- Mireille T.

"Every allowance was itemised at the start, so the finish selections did not turn into a surprise at the end."

- Benedict H.

How It Works in Santa Monica

Getting your adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Santa Monica - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

Request a Free Estimate

Tell us what's going on in Santa Monica - we'll get back to you fast. No obligation.

By reaching out through this form, you confirm you have read our Privacy Policy and consent to receive communications by telephone, text message, or email about your request, including by the independent professionals who may fulfill it.

Call Now - 24/7 Dispatch
Areas We Serve
Call Now - 24/7 Dispatch